CCGA Rework Process Overview

   
 
Unprepared Ceramic Column Grid Array Site
After normal removal of a CCGA (Ceramic Column Grid Array) component, excess solder remains on the pads. This solder must be removed prior to placement of a new CCGA component. The solder left behind after the removal of a component can also give us clues as to possible failures of the initial attachment of a CCGA or BGA. Oxidation is a common problem of failure as well as imperfections in the printed circuit board manufacturing process. With these instances of contamination, solder will not make contact with a pad and/or no solder will be left on a particular pad site. eTech’s BGA operators closely inspect each pad site under a microscope after the removal of a CCGA or BGA component.
Unprepared Ceramic Column Grid Array Site
 
Site Dressed Ceramic Column Grid Array Site
Solder is removed from CCGA (Ceramic Column Grid Array) and BGA (Ball Grid Array) pad sites using a Edsyn hot air solder vacuum system. This ensures that our process is less likely to cause damage to the site while removing excess solder. eTech uses solder wick only when absolutely necessary. We have found that solder wick increased the likelihood of solder mask damage on CCGA as well as BGA components.
Site Dressed Ceramic Column Grid Array Site
 
“Pasted” Ceramic Column Grid Array Site
eTech operators receive extensive training on proper paste application. Paste application process is critical in every placement, but becomes more so with smaller pitch sizes in today’s CCGA (Ceramic Column Grid Array) components. The “dollops” of paste left behind when a mini stencil is removed from the site, must be uniform and look like tiny columns. Our operators do a 100% inspection under a microscope of all pasted sites before placement of CCGA’s (Ceramic Column Grid Array).
“Pasted” Ceramic Column Grid Array Site
 
CCGA Pad Site
 
Alignment view of Pad Site and CCGA Component
 
Bottom view of CCGA Component
CCGA Pad Site Alignment view of Pad Site and CCGA Component Bottom view of CCGA Component
Component Alignment of Ceramic Column Grid Array on Summit 1100 HR
Ceramic Column Grid Array Chip and PCB Pad alignment are paramount. Improper alignment of the CCGA component prior to placement can result in bridges or improper electrical connections. Our rework machines are equipped with Micrometer adjustments to facilitate perfect CCGA alignments with each placement. eTech operators are trained to treat every CCGA and BGA as one that needs to be perfectly aligned to ensure success.
 
Thermal Profiling of Ceramic Column Grid Array on Summit 1100 HR
Our Technicians have over 12 years combined experience in thermal profiling and are proficient in optimizing the Summit 1100 HR profiling system. The machine, while easily operated, takes a “special skill” in profiling. eTech’s successful rework capability is directly related to our proficiency with the thermal profile procedure. Our technicians utilize two methods of profiling. The first method is the non-destructive method. It utilizes multiple thermocouples placed directly underneath the component to be removed. The second method is the destructive method, whereas the technician drills holes through the board and into the solder joint under the BGA or CCGA. This method yields the most accurate temperature measurements; however, destruction of the board and component may not be an option for a particular application.
Thermal Profiling of Ceramic Column Grid Array on Summit 1100 HR
 
Component Reflow of Ceramic Column Grid Array Component
Site preparation, component alignment and Thermal profiles are the keys to successful CCGA and BGA rework. This example shows a reworked Ceramic Column Grid Array site after reflow. The component is centered on the pad and the filet is uniform and shiny. eTech’s operators take pride with their ability to consistently produce results as the one shown here.
Component Reflow of Ceramic Column Grid Array Component
 
X-ray and Quality Control of Ceramic Column Grid Array Component X-ray and Quality Control of Ceramic Column Grid Array Component
X-ray and Quality Control of Ceramic Column Grid Array Component
The final step in eTech’s rework process are our X-Ray and Quality Control procedures. Each CCGA and BGA placements are individually x-rayed as well as given a four-point visual inspection under a microscope. Operators inspect for any imperfection with the component placement as well as any collateral damage to the reworked component. eTech also offers this X-ray and Quality Control Service to customers whereas production work of the assemblies has been performed in other facilities.